PARCIC — Layout pricing and assumptions worksheet Template edition: 2026-10-18 Blank planning worksheet, not a property report or professional certification. No property has been verified by downloading this file; no feasibility is certified. Keep missing evidence UNVERIFIED and unknown costs UNPRICED. Property address: APN(s): Governing jurisdiction: Study / saved version: Prepared by / date: 1. SELECTED DESIGN Option / saved version / concept receipt: Building type / use permission status: Gross and net floor area / homes or rooms: Placed and target parking / unresolved shortfall: Paved union area / road-centerline length: 2. COST RECORD — repeat for every measured line or allowance Scope: Measured quantity / unit, or explicitly ALLOWANCE: Rate / unit: UNPRICED Amount: UNPRICED Source / scope inclusions and exclusions: Quote or observation date / date checked: Potential overlap with another line: 3. REQUIRED BUDGET REVIEW [ ] Land and acquisition closing costs [ ] Gross building work [ ] Paving, markings and additional road infrastructure without overlap [ ] Explicit earthwork, utility and drainage allowances [ ] Other applicable permits, demolition, remediation and offsite work [ ] Soft costs and contingency with their percentage bases recorded [ ] Predevelopment, construction, hold and carrying assumptions [ ] Disposition costs Unknown costs remain UNPRICED. Record why any reviewed zero is appropriate. 4. REVENUE AND TIMING Sale / rental / hotel mode: Price basis: net sq ft / home or room / room-night Rent time basis where applicable: month / year Rate: UNPRICED Comparable / quote source and observation date: Vacancy or occupancy / operating expense scope / exit cap assumptions: Predevelopment / construction / hold months and support: No lender debt, tax benefit, growth or appreciation is implied. 5. SCENARIO REVIEW Base input record / version: Changed input and reason: Result basis being compared: Missing inputs or layout blockers keeping returns unavailable: Next quote / reviewer / follow-up date: This worksheet does not calculate or certify an investment return. Guide: https://parcic.com/guides/layout-pro-forma