PARCIC — Zoning and use worksheet Template edition: 2026-10-18 Blank research worksheet, not a property report or professional certification. No property has been verified by downloading this file. Complete it locally. Keep unknown amounts UNPRICED; keep unresolved findings UNVERIFIED. Property address: APN(s): Governing jurisdiction: Intended use / project: Prepared by / date: RULE RECORD — repeat for each required rule Rule / proposed use: Value and units: UNVERIFIED Status: UNVERIFIED / sourced but applicability unresolved / confirmed for stated purpose Ordinance section, table and footnote: Official source URL / document page: Effective date: Retrieved date: Why it applies to this APN and project: Conflicting source or exception: Reviewer / authority / response date: REQUIRED TOPICS — do not mark complete from a district label alone [ ] Governing authority, district and overlays [ ] Intended use and approval process [ ] Front / side / rear setbacks and frontage [ ] Height and story definitions [ ] Lot coverage, FAR and area definitions [ ] Density / minimum lot area / unit mix [ ] Parking, loading and access [ ] Open space and other applicable site requirements [ ] Site-specific conditions and later amendments OPERATING QUESTIONS — separate from physical building capacity [ ] Rental licensing and length-of-stay restrictions [ ] Rent limits and existing tenant rights [ ] Recorded covenants, condominium / HOA restrictions and leases Status of each: UNVERIFIED PLANNING REQUEST For [address and APN], I am evaluating [proposed use, size and unit mix]. Please confirm the district and overlays, use classification, approval path, and applicable sections for height, setbacks, density/FAR, parking and access. Are there site-specific approvals or amendments? What formal confirmation is needed? Reply / source / date: Remaining blockers: Outputs that remain conditional or unavailable: Guide: https://parcic.com/guides/read-zoning